For the first time ever visitors to the 2020 event saw a campervan being kitted out from start to finish at the show.
Caledonian Campers did a live build in 4 days! Every detail was built on site from the cabinets being made, to the fitting of the roof, the installation of the plumbing and electrics through to the fitting of the beds, everything happened live at the show.
Day 1
- Cabinet and workbenches
- Fitting roof and flashings
- Upholstery
Day 2
- Fitting packers/Insulation/floor
- Fitting carpet
- Fitting curtains
- Fitting splashback
- Wiring and plumbing cabinet
Day 3
- Fitting of cabinet to van
- Fitting of worktop
- Fitting overhead locker & shelves
- Plumbing & electrics fitted to cabinet in van
- Roof headlining
Day 4
- Fitting bed to van
- Fitting upper bed kit
- Fitting front and back bed boards
- Fitting water tank
- Fitting front seats
- Fitting side step
- Campervan will be completed on Sunday!!